12 Days to Crafted: Day 2 of the Big Build!

Photo1 (4)

We are primed and ready for our base coat, Mr. Demille!

We’d hoped to prime and do a base coat in one day, but, it was so darn humid today that the primer was still tacky to the touch several hours after we applied it and we opted to let it dry overnight.

Photo1 (8)

We kind of just lay around and watched paint dry for part of the afternoon, before we decided it was hopeless.

Photo1 (10)

I am a champion painter, but not particularly tidy about it.

Tomorrow will be a short day at the port. We’re going in early to lay down a base coat of color, then off to Home Depot for flooring (omg! I have picked out my flooring!)

My life is so exciting these days, I spend all my time researching ADA compliant floor strips, and rubber molding.

Tomorrow I’ll take you on a tour around the Crafted campus, show you some other vendor booths, and of course a shot or two of the H&O booth in progress.

Maybe we’ll talk floor strips. It’ll be exciting.

Advertisements

About Maia Rainwood

Owner and Maker at Maia Rainwood Design. Wearable art for wise women, birth keepers, witches, and world-builders.
This entry was posted in Crafted at the Port of LA. Bookmark the permalink.

One Response to 12 Days to Crafted: Day 2 of the Big Build!

  1. You should try using mirrors to light your odd little pillar corner. Maybe a mirrored strip on the end cap. You can try and capture that beautiful natural light and angle it in the direction you need it.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s